Skip to content
Vince.by Dogma Systems

Production

Manufacturing & costing module

From master formula to cost variance, on one order.

Versioned formulas with a second pair of eyes, production orders exploded into materials, a shop-floor kiosk for operators, and normal costing that reconciles work in progress to the general ledger.

https://vince.app/production/orders/OP-2026-0318

Production order · OP-2026-0318

Herbal shampoo 400 ml · 2,400 units

Lot L26-1014 Formula v4 · approved

Route

  1. Weighing

  2. Mixing

  3. Filling

  4. Labeling

  5. Packing

Materials from formula

MaterialStandardIssued
Purified water820.0 kg820.0 kg
Sodium laureth sulfate96.0 kg97.7 kg
Chamomile extract4.8 kg4.8 kg
Bottle 400 ml PET2,400 u2,400 u
Flip-top cap2,400 u1,200 u

Cost to date

Standard

$4,820.00

Actual

$4,905.40

Variances

  • Material usage+1.8%
  • Labor efficiency−3.2%
  • Overhead rate+0.4%
variance categories
9variance categories
week multi-level plan
13week multi-level plan
people on every formula
2people on every formula
01

Formulas with a second pair of eyes

Master formulas are versioned and move from draft to submitted to approved — and the approver can never be the author, as good manufacturing practice expects.

02

A shop floor that records itself

A tablet kiosk where operators sign in with a PIN or a Code 128 badge. Steps pause, run in parallel, and are skipped only with a supervisor’s approval.

03

Normal costing, reconciled

Materials at moving average, labor at actual minutes times rate, overhead at a predetermined rate per labor hour — with work in progress reconciled to the general ledger.

04

Variances that explain themselves

Nine categories — material price, usage and substitution; labor rate and efficiency; overhead rate and efficiency; lot size; other — settled incrementally.

Built for gloves and tablets

Big targets, one step at a time, and a timer that knows the tolerance.

https://vince.app/production/floor
Operator 0142 · R. Martínez Certified

38:12

/ 45:00

Mixing

Tank T-02 · OP-2026-0318

Standard 45 min · tolerance ±10%

PauseComplete step
Running in parallel: CIP cleaning · Line 2Next: Filling

Engineering

A clear hierarchy
Cost center, manufacturing method, versioned activity route and versioned standard times per product.
Standard times with tolerances
Setup and run minutes per base quantity, with the tolerance each step is measured against.
Qualification matrix
Steps that require a certified operator can only be signed by one.
Printed documents
Order sheet, material requisition, formula print and cost sheet, ready for the batch record.

Orders & floor

Materials exploded from the formula
An order’s material list comes from the approved version, with the lot number on the order.
Approval and requisitions
The production manager approves; materials are requisitioned incrementally as the batch needs them.
Deviation reasons, never blocks
A time outside tolerance asks for a reason code — and lets the operator keep working.
Output into sales
Finished goods flow into sales drafts, so what you made is ready to bill.

Planning & insight

13-week MRP plan
A weekly multi-level plan with make-versus-buy, flagging releases that are already late.
Monthly close
Under- and over-applied overhead closed each month; costs post nightly to the ledger.
Production dashboard
Labor efficiency, deviation by activity, tolerance compliance by operator, pause time by reason.
Standard versus real
Standard and real labor cost and man-hours per batch, side by side.

More of Vince

See Vince running on your own operation.

Half an hour, in English or Spanish. Tell us how you work today and we will show you what it looks like on Vince.

Let’s talk about your operation

Tell us how you work today. A person on our team — not a bot — will reply within one business day, in English or Spanish.